Recently, our 70 tonne mobile crane was hired by a local Fife company to assist with the task of topping and tailing a number of vessels in preparation for transport to China.

Restricted head height, access issues and lack of head room made topping and tailing the 23,000kg vessel a real challenge for our crane crew. 

Due to the nature of the lift, the client requested for the works be carried out under CPA Contract Lift conditions. 

The contract lift was planned and supervised by our appointed team member and executed by our slinger signallers. 

A 70 tonne mobile crane was used in combination with the clients overhead crane.